<?xml version="1.0" encoding="UTF-8"?>
<OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd">
  <responseDate>2026-08-06T21:34:51Z</responseDate>
  <request identifier="10662" metadataPrefix="oai_dc" verb="GetRecord">https://drops.dagstuhl.de/oai</request>
  <GetRecord>
    <record>
      <header>
        <identifier>oai:drops-oai.dagstuhl.de:10662</identifier>
        <datestamp>2024-03-06T10:46:24Z</datestamp>
        <setSpec>ddc:004</setSpec>
        <setSpec>open_access</setSpec>
      </header>
      <metadata>
        <oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
          <dc:title>Scheduling to Approximate Minimization Objectives on Identical Machines</dc:title>
          <dc:creator>Moseley, Benjamin</dc:creator>
          <dc:subject>Scheduling</dc:subject>
          <dc:subject>LP rounding</dc:subject>
          <dc:subject>Approximation Algorithms</dc:subject>
          <dc:description>This paper considers scheduling on identical machines. The scheduling objective considered in this paper generalizes most scheduling minimization problems. In the problem, there are n jobs and each job j is associated with a monotonically increasing function g_j. The goal is to design a schedule that minimizes sum_{j in [n]} g_{j}(C_j) where C_j is the completion time of job j in the schedule. An O(1)-approximation is known for the single machine case. On multiple machines, this paper shows that if the scheduler is required to be either non-migratory or non-preemptive then any algorithm has an unbounded approximation ratio. Using preemption and migration, this paper gives a O(log log nP)-approximation on multiple machines, the first result on multiple machines. These results imply the first non-trivial positive results for several special cases of the problem considered, such as throughput minimization and tardiness. &#13;
Natural linear programs known for the problem have a poor integrality gap. The results are obtained by strengthening a natural linear program for the problem with a set of covering inequalities we call job cover inequalities. This linear program is rounded to an integral solution by building on quasi-uniform sampling and rounding techniques.</dc:description>
          <dc:publisher>Schloss Dagstuhl – Leibniz-Zentrum für Informatik</dc:publisher>
          <dc:contributor>Benjamin Moseley</dc:contributor>
          <dc:date>2019</dc:date>
          <dc:relation>Is Part Of LIPIcs, Volume 132, 46th International Colloquium on Automata, Languages, and Programming (ICALP 2019)</dc:relation>
          <dc:type>InProceedings</dc:type>
          <dc:type>Text</dc:type>
          <dc:type>doc-type:ResearchArticle</dc:type>
          <dc:type>publishedVersion</dc:type>
          <dc:format>application/pdf</dc:format>
          <dc:identifier>doi:10.4230/LIPIcs.ICALP.2019.86</dc:identifier>
          <dc:identifier>urn:nbn:de:0030-drops-106621</dc:identifier>
          <dc:identifier>https://drops.dagstuhl.de/entities/document/10.4230/LIPIcs.ICALP.2019.86</dc:identifier>
          <dc:language>eng</dc:language>
          <dc:rights>https://creativecommons.org/licenses/by/3.0/legalcode</dc:rights>
        </oai_dc:dc>
      </metadata>
    </record>
  </GetRecord>
</OAI-PMH>
