<?xml version="1.0" encoding="UTF-8"?>
<OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd">
  <responseDate>2026-07-24T05:46:36Z</responseDate>
  <request identifier="2757" metadataPrefix="oai_dc" verb="GetRecord">https://drops.dagstuhl.de/oai</request>
  <GetRecord>
    <record>
      <header>
        <identifier>oai:drops-oai.dagstuhl.de:2757</identifier>
        <datestamp>2024-03-06T10:28:44Z</datestamp>
        <setSpec>ddc:004</setSpec>
        <setSpec>open_access</setSpec>
      </header>
      <metadata>
        <oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
          <dc:title>The Complexity of Integrating Routing Decisions in Public Transportation Models</dc:title>
          <dc:creator>Schmidt, Marie</dc:creator>
          <dc:creator>Schöbel, Anita</dc:creator>
          <dc:subject>Line Planning</dc:subject>
          <dc:subject>Timetabling</dc:subject>
          <dc:subject>Routing</dc:subject>
          <dc:description>To model and solve optimization problems arising in public&#13;
transportation, data about the passengers is necessary and has to be&#13;
included in the models in any phase of the planning process. Many&#13;
approaches assume a two-step procedure: in a first step, the data&#13;
about the passengers is distributed over the public transportation&#13;
network using traffic-assignment procedures.  In a second step, the&#13;
actual planning of lines, timetables, etc. takes place. This approach&#13;
ignores that for most passengers there are many possible ways to reach&#13;
their destinations in the public transportation network, thus the&#13;
actual connections the passengers will take depend strongly on the&#13;
decisions made during the planning phase.  In this paper we&#13;
investigate the influence of integrating the traffic assignment&#13;
procedure in the optimization process on the complexity of line&#13;
planning and aperiodic timetabling. In both problems, our objective is&#13;
to maximize the passengers' benefit, namely to minimize the overall&#13;
travel time of the passengers in the network.  We present new models,&#13;
analyze NP-hardness results arising from the integration of the routing&#13;
decisions in the traditional models, and derive polynomial algorithms&#13;
for special cases.</dc:description>
          <dc:publisher>Schloss Dagstuhl – Leibniz-Zentrum für Informatik</dc:publisher>
          <dc:contributor>Marie Schmidt and Anita Schöbel</dc:contributor>
          <dc:date>2010</dc:date>
          <dc:relation>Is Part Of OASIcs, Volume 14, 10th Workshop on Algorithmic Approaches for Transportation Modelling, Optimization, and Systems (ATMOS'10) (2010)</dc:relation>
          <dc:type>InProceedings</dc:type>
          <dc:type>Text</dc:type>
          <dc:type>doc-type:ResearchArticle</dc:type>
          <dc:type>publishedVersion</dc:type>
          <dc:format>application/pdf</dc:format>
          <dc:identifier>doi:10.4230/OASIcs.ATMOS.2010.156</dc:identifier>
          <dc:identifier>urn:nbn:de:0030-drops-27575</dc:identifier>
          <dc:identifier>https://drops.dagstuhl.de/entities/document/10.4230/OASIcs.ATMOS.2010.156</dc:identifier>
          <dc:language>eng</dc:language>
          <dc:rights>https://creativecommons.org/licenses/by-nc-nd/3.0/legalcode</dc:rights>
        </oai_dc:dc>
      </metadata>
    </record>
  </GetRecord>
</OAI-PMH>
