<?xml version="1.0" encoding="UTF-8"?>
<OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd">
  <responseDate>2026-07-22T12:14:53Z</responseDate>
  <request identifier="8531" metadataPrefix="oai_dc" verb="GetRecord">https://drops.dagstuhl.de/oai</request>
  <GetRecord>
    <record>
      <header>
        <identifier>oai:drops-oai.dagstuhl.de:8531</identifier>
        <datestamp>2024-03-06T10:42:18Z</datestamp>
        <setSpec>ddc:004</setSpec>
        <setSpec>open_access</setSpec>
      </header>
      <metadata>
        <oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
          <dc:title>Approximation Algorithms for Scheduling with Resource and Precedence Constraints</dc:title>
          <dc:creator>Demirci, Gökalp</dc:creator>
          <dc:creator>Hoffmann, Henry</dc:creator>
          <dc:creator>Kim, David H. K.</dc:creator>
          <dc:subject>scheduling</dc:subject>
          <dc:subject>resource</dc:subject>
          <dc:subject>precedence</dc:subject>
          <dc:subject>weighted completion time</dc:subject>
          <dc:description>We study non-preemptive scheduling problems on identical parallel machines and uniformly related machines under both resource constraints and general precedence constraints between jobs. Our first result is an O(logn)-approximation algorithm for the objective of minimizing the makespan on parallel identical machines under resource and general precedence constraints. We then use this result as a subroutine to obtain an O(logn)-approximation algorithm for the&#13;
more general objective of minimizing the total weighted completion time on parallel identical machines under both constraints. Finally, we present an O(logm logn)-approximation algorithm for scheduling under these constraints on uniformly related machines. We show that these results can all be generalized to include the case where each job has a release time. This is the first upper bound on the approximability of this class of scheduling problems where both resource and general precedence constraints must be satisfied simultaneously.</dc:description>
          <dc:publisher>Schloss Dagstuhl – Leibniz-Zentrum für Informatik</dc:publisher>
          <dc:contributor>Gökalp Demirci and Henry Hoffmann and David H. K. Kim</dc:contributor>
          <dc:date>2018</dc:date>
          <dc:relation>Is Part Of LIPIcs, Volume 96, 35th Symposium on Theoretical Aspects of Computer Science (STACS 2018)</dc:relation>
          <dc:type>InProceedings</dc:type>
          <dc:type>Text</dc:type>
          <dc:type>doc-type:ResearchArticle</dc:type>
          <dc:type>publishedVersion</dc:type>
          <dc:format>application/pdf</dc:format>
          <dc:identifier>doi:10.4230/LIPIcs.STACS.2018.25</dc:identifier>
          <dc:identifier>urn:nbn:de:0030-drops-85319</dc:identifier>
          <dc:identifier>https://drops.dagstuhl.de/entities/document/10.4230/LIPIcs.STACS.2018.25</dc:identifier>
          <dc:language>eng</dc:language>
          <dc:rights>https://creativecommons.org/licenses/by/3.0/legalcode</dc:rights>
        </oai_dc:dc>
      </metadata>
    </record>
  </GetRecord>
</OAI-PMH>
