This paper provides an overview of the research in railway scheduling and dispatching. A distinction is made between tactical scheduling, operational scheduling and re-scheduling. Tactical scheduling refers to master scheduling, whereas operational scheduling concerns scheduling at a later stage. Re-scheduling focuses on the re-planning of an existing timetable when deviations from it have occurred. 48 approaches published between 1973 and 2005 have been reviewed according to a framework that classifies them with respect to problem type, solution mechanism, and type of evaluation. 26 of the approaches support the representation of a railway network rather than a railway line, but the majority has been experimentally evaluated for traffic on a line. 94 % of the approaches have been subject to some kind of experimental evaluation, while approximately 4 % have been implemented. The solutions proposed vary from myopic, priority-based algorithms, to traditional operations research techniques and the application of agent technology.This paper provides an overview of the research in railway scheduling and dispatching. A distinction is made between tactical scheduling, operational scheduling and re-scheduling. Tactical scheduling refers to master scheduling, whereas operational scheduling concerns scheduling at a later stage. Re-scheduling focuses on the re-planning of an existing timetable when deviations from it have occurred. 48 approaches published between 1973 and 2005 have been reviewed according to a framework that classifies them with respect to problem type, solution mechanism, and type of evaluation. 26 of the approaches support the representation of a railway network rather than a railway line, but the majority has been experimentally evaluated for traffic on a line. 94 % of the approaches have been subject to some kind of experimental evaluation, while approximately 4 % have been implemented. The solutions proposed vary from myopic, priority-based algorithms, to traditional operations research techniques and the application of agent technology.
@InProceedings{tornquist:OASIcs.ATMOS.2005.659, author = {T\"{o}rnquist, Johanna}, title = {{Computer-based decision support for railway traffic scheduling and dispatching: A review of models and algorithms}}, booktitle = {5th Workshop on Algorithmic Methods and Models for Optimization of Railways (ATMOS'05)}, pages = {1--23}, series = {Open Access Series in Informatics (OASIcs)}, ISBN = {978-3-939897-00-2}, ISSN = {2190-6807}, year = {2006}, volume = {2}, editor = {Kroon, Leo G. and M\"{o}hring, Rolf H.}, publisher = {Schloss Dagstuhl -- Leibniz-Zentrum f{\"u}r Informatik}, address = {Dagstuhl, Germany}, URL = {https://drops.dagstuhl.de/entities/document/10.4230/OASIcs.ATMOS.2005.659}, URN = {urn:nbn:de:0030-drops-6592}, doi = {10.4230/OASIcs.ATMOS.2005.659}, annote = {Keywords: Decision support, railway traffic scheduling, railway traffic dispatching, overview} }
Feedback for Dagstuhl Publishing