Challenges for Multi-function SoC Scheduling and Assistive Living Services

Author Chi-Sheng Shih



PDF
Thumbnail PDF

File

DagSemProc.08071.3.pdf
  • Filesize: 140 kB
  • 5 pages

Document Identifiers

Author Details

Chi-Sheng Shih

Cite AsGet BibTex

Chi-Sheng Shih. Challenges for Multi-function SoC Scheduling and Assistive Living Services. In Scheduling. Dagstuhl Seminar Proceedings, Volume 8071, pp. 1-5, Schloss Dagstuhl – Leibniz-Zentrum für Informatik (2008)
https://doi.org/10.4230/DagSemProc.08071.3

Abstract

Tasks on assistive living devices and multi-function SoC (MFSoC) have the requirements to meet certian timing constraint. Examples include the end-to-end throughput constraint on MFSoC and deadline constraint on assistive living devices. However, the workload model on the two application domains are different from conventional real-time workload models. The new workload model, hence, impose new scheduling challenges on real-time computing community. In this short paper, we will discuss the new workload models and the challenging issues on scheduling such tasks.
Keywords
  • Real-time Task Scheduling

Metrics

  • Access Statistics
  • Total Accesses (updated on a weekly basis)
    0
    PDF Downloads